A Bournemouth homeowner had their kitchen stripped back for a full refit with fitter Gavin Smith. We took the electrical side from first fix through to certification, working to the fitter's programme so the units went in on schedule.

High-spec modern kitchen interior with completed ceiling spotlighting and functional layout in Bournemouth.
Featured
Bournemouth, BH1
Domestic Kitchen Refit
First & Second Fix · NAPIT Certified
March 2026
EIC & Part P Notified

Project Gallery

Detailed photographs from first fix containment and wiring layouts through to the completed second fix installations of premium accessories, layered task lights, and dedicated appliance circuits.

Warm white downlights and under-cabinet strip lights on after complete second-fix completion.
01Finished Kitchen Lighting
First fix electrical cables cleanly routed down chasing and studs before plastering.
02First Fix Lighting Cables
Marking out and cutting ceiling downlight positions set forward of future wall units.
03Precision Downlight Hole Cutting
High-density LED profile lighting installed underneath kitchen cupboards to eliminate shadows.
04Under-Cabinet LED Task Lights
Chrome dual sockets aligned square with the tile layout over kitchen worktops.
05Precisely Levelled Double Sockets
Satin chrome metal clad dual power outlet fitted cleanly onto tiled splashback.
06Chrome Sockets Over Tiles
Heavy duty cooking appliance wiring outlet box ready for the induction hob.
07Dedicated Induction Hob Circuit
Dedicated switched fused connection unit installed inside a cupboard to power larder lighting.
08Pantry Switched Fused Spur

Coordination is Key

A complete kitchen refurbishment requires flawless timing between trades. When the homeowner stripped their Bournemouth kitchen back to the bare brick, we coordinated closely with the kitchen fitter, Gavin Smith. Delivering the first-fix cable routing on a strict timetable was crucial to allow plastering, tiling, and unit installation to progress without a single day of delay.

Older kitchens often rely on legacy ring-main systems and single, undersized cooker feeds. For this project, a modern, heavy-load layout was designed to accommodate high-spec induction cooking, discrete task lighting, and convenient, beautifully aligned power outlets.

Every aspect of the wiring was completed in full compliance with BS 7671 regulations and registered through NAPIT (Membership 69418) under Part P guidelines.

Project Details
LocationBournemouth, Dorset
Fitter PartnerGavin Smith
Electrical ScopeFirst & Second Fix
AccreditationNAPIT Registered
CompliancePart P Notified
StatusFully EIC Certified
Key Features
Induction HobDedicated circuit
Cabinet LEDsIndependent switch
Pantry PowerFused inside larder
SymmetryAligned with tile course
StandardsBS 7671 Compliant

Every Detail Addressed

01

Dedicated Induction Hob Circuit

Instead of reusing the existing freestanding cooker supply, we ran a brand new dedicated circuit sized specifically for the new induction hob. Modern induction hobs pull a high transient load, and relying on old, legacy wires can create a thermal hazard. A fresh cable ensures peak performance and complete safety.

02

Acoustically & Visually Placed Downlights

Ceiling downlights are set forward of where the wall units sit. Standard installations frequently place spots directly over the cabinets or too close to the walls, casting deep shadows on the food prep areas. By bringing them forward, light lands perfectly on the front edge of the worktop.

03

Switched Fused Spur for Pantry Strips

The larder LED strip lighting is fed via a switched fused spur mounted neatly inside the cupboard. This means the strip and its power driver can be isolated or serviced independently at any point, without killing the rest of the kitchen's lighting rings.

04

Symmetrical Socket Heights & Placement

Socket heights were measured out down to the millimetre before tiling commenced. By mapping them out with the plasterer and tiler in advance, the satin chrome double socket plates sit perfectly centered in the metro tile course, completely avoiding messy overlaps or straddling grout lines.

05

Split Task & Ambient Lighting Control

We split the under-cabinet LED task lighting onto its own independent switch, separated from the ceiling downlights. This provides layered lighting control — allowing the worktops to be lit as high-contrast task zones while keeping the main room soft, or vice-versa.

"

"We take the electrical side from first fix through to certification, working with the fitter's programme so the units went in on schedule. Marking out accessories in advance makes a massive difference to the final aesthetic."

SC Electric · Registered NAPIT Member 69418
REFIT
Bournemouth · Poole · Christchurch · Ferndown · Wimborne

Planning a
Kitchen Refit?

Need the electrics sorted before the units land? Get in touch for a written, transparent quote with no hidden extras.