A Bournemouth flat owner called the fire service after smoke and flames erupted from their cupboard. Firefighters isolated the flat and instructed them to call an electrician. We attended immediately, traced the fault, and safely resolved the hazard.

Electrician testing electrical installations on-site in Bournemouth.
Emergency
Bournemouth, BH1
Emergency Callout & Fault Find
Hazard Isolated & Rectified
August 2026
Fire Hazard Eliminated

Evidence & Resolution Gallery

Visual inspection logs of the heat damage, overloaded contact blocks, burnt casings, cooked cable tails, and the completed correctly rated switched spur installation.

Heavy carbonization and melting on the rear terminal block of the heating programmer.
01Burnt-Out Programmer
The plastic mounting box showing extreme thermal melting on the rear face.
02Scorched Back Box
Tails of cable with brittle, scorched PVC insulation that had to be cut back.
03Heat-Damaged Cable Tails
Detail of the welded internal relay contacts that caused the fire.
04Carbonised Internals
Burnt wood and black soot on the wall behind the heating programmer.
05Cupboard Fire Damage
Using professional diagnostic testing instruments to isolate electrical systems.
06On-Site Diagnostics
Isolating the incoming supply to guarantee safe working conditions before repair.
07Safe Isolation Verification
Tracing how the heavy duty water heater was improperly wired into the heating programmer.
08Dangerous Immersion Feed
The new 20A double pole switched fused spur installed on its own dedicated circuit.
09Correctly Rated Spur Fitted
Neat, modern, and code-compliant wiring with complete mechanical security.
010Safe Connection & Verification
Internal view of contact pins fused together from continuous arcing under 13A load.
011Overloaded Relays Close-up
Full insulation resistance testing to ensure no hidden faults remained on the system.
012Testing Integrity

The Dangerous Overload Traced

A Bournemouth tenant was alarmed when visible flames and thick smoke started rising from the central heating control cupboard. After quickly calling the fire service, firefighters isolated the entire property's electrical supply. They strictly instructed the customer not to re-energize the flat until a qualified electrician completed a full diagnostic investigation and resolved the root cause of the hazard.

We responded to the emergency callout immediately. Upon removing the central heating programmer from the wall, the severity of the damage became instantly clear. The plastic housing had melted, and the internal contacts were completely carbonized and welded together. Sooey black residue coated the plaster behind the mounting box.

Tracing the wiring revealed a severe, hidden installation error: the heavy-load 3kW immersion water heater had been wired directly through the central heating programmer.

Project Details
LocationBournemouth, Dorset
Task TypeEmergency Callout
Fault FoundImmersion Overload
AccreditationNAPIT Registered
Response TimeImmediate Attendance
StatusSafe & Code Compliant
Critical Faults Found
Relay ContactsRated 5(2)A maximum
Immersion LoadPulls approx 13A
Contact StateWelded & Carbonised
Cable InsulCooked & Brittle
Risk LevelHigh Fire Hazard

Emergency Rectification

01

Overloaded Relays Identified

A standard heating programmer's contact relays are rated for 5(2)Amps maximum, designed to handle light boiler control loads. An immersion heater pulls approximately 13 Amps. Operating at more than double its physical limit caused continuous arcing, which welded the contacts and ignited the plastic casing.

02

Cables Cut Back and Stripped

Swapping the programmer alone would have left cooked, brittle cable tails inside the box, which can flake away and lead to a secondary short circuit. We cut back the heat-damaged conductor tails to sound, flexible copper cores with healthy insulation.

03

Properly Rated 20A Switched Spur Fitted

We permanently isolated the immersion water heater from the low-power central heating programmer. A dedicated, correctly rated 20-Amp double pole switched fused connection spur was installed to power the immersion heater safely.

04

Soot Removal and Thermal Checks

The carbonised residue was carefully cleaned out of the back box, and thermal integrity checks were conducted using digital testing instrumentation to confirm no residual heating issues remained.

05

BS 7671 System Integrity Testing

Before re-energizing the consumer unit, we carried out comprehensive dead testing—including insulation resistance tests at 500V—to confirm the circuit was entirely safe to put back into regular service.

"

"A central heating programmer looks like the most intuitive place to program hot water timing, but low-current contacts cannot cope with heavy immersion heating. Always ensure high-load appliances have dedicated, correctly rated controls."

SC Electric · Registered NAPIT Member 69418
SAFE
Bournemouth · Poole · Christchurch · Ferndown · Wimborne

Experiencing an
Electrical Fault?

If the fire service or your consumer unit has tripped your supply, do not force it back on. Get an approved registered electrician to safely diagnose the fault.